Case Study 1: Agile in Practice – An Agile Success Story

Case Study 1: Agile in Practice – An Agile Success Story

Write a four to five (4-5) page paper in which you:

  1. Determine the key reasons why Deloitte Consulting (DC) chose a modified SCRUM method instead of a traditional waterfall method.
  2. Explain how DC performed project planning and analyze its effectiveness for later execution and product release.
  3. Identify the challenges that DC encountered in each project phase and explain how they overcame those challenges. Give an opinion on whether the Agile concepts played an important role in this process.
  4. Determine the techniques that DC used to monitor the project progress and evaluate how it enabled the project success.
  5. Explain why DC did not use offshore resources and evaluate whether the Agile method will work in a project with diverse workforce geographically and culturally. .
  6. Speculate on the leadership roles needed if you were part of the DC team.
  7. Use at least three (3) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
  • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

Answer preview

Agile Software Development Life Cycle is a model which relies on handling projects differently while tailoring the existing methods to suit the requirements of the projects. Tasks are divided into time boxes, and an iterative approach adapted to ensure that the working software build is delivered after each iteration. The agile method was used by Deloitte Consulting so that it could help deal with software problems they were experiencing. Deloitte Consulting (DC) chose a modified SCRUM method instead of a traditional waterfall method because the assets, timeline, finances, and paraphernalia were controlled. In this paper, I am going to determine the main reasons why Deloitte Consulting picked a modified scrum method instead of the other traditional methods, explain how the project planning was…

 

(1300 words)

Scroll to Top