Project Plan for Building a House
Outcomes 5 & 6 – Project Plan
Students will develop a standard project plan for a project of their choosing that must be approved by the mentor, or for building a house. The project must have all the elements for meeting the requirements of the course assignments which includes a work breakdown structure (WBS) with a minimum of 4 levels, a WBS dictionary, and time and cost estimates for each task in the WBS. Based on this WBS, students will create a network diagram of the project and identify the critical path, create a project schedule and budget correlated to time and cost estimates provided in the (WBS) and create a resource breakdown structure reflecting the requirements identified in the WBS dictionary. Finally, they will identify high level quality control trigger points.
Students may propose an alternative project of their own design that shows attainment of the corresponding course outcome. The mentor must approve the alternative project.
Answer previewProject Plan for Building a House
Several tasks are involved in fulfilling the desired outputs of a project plan for building a house. The assumptions made in the plan are that the design for the house is already complete and all the necessary permits are issued. The project scope is thus ensuring that the materials which are already ordered are made into a complete house. In a work breakdown structure, the project objectives will be broken down into smaller components into different levels to represent the individual tasks such as finishing the electrical cable works (Miller, 2008). The discussion will also include an integration of the team structures to the various tasks to build integration of the roles. This is a key aspect in the organization of the roles to ensure that all the objectives of the project are achieved. The project is focused on an individual house such that all the skills will be used to complete the project within six months…
(1800 words)