CASE STUDY THE DMAIC PROCESS ASSIGNMENT

Case Study the DMAIC Process Assignment

Case Study The DMAIC Process Assignment

Using the Control Chart and the Pareto Chart process improvement tools for this case study. This case study ask you to use the DMAIC process for your process improvement project.

The basis of this case study will follow Table 13-2 in your textbook, the Six Sigma processDMAIC:

• Define the project goals and customer (internal and external) deliverables.

• Measure the process to determine current performance.

• Analyze and determine the root causes of the defects.

• Improve the process by eliminating defects.

• Control future process performance.

Provide at least one paragraph for each DMAIC step as noted above. Be creative and apply research, course concepts, tools, and techniques to help improve your process.

12-point Times New Roman font, and one- inch margins. Two pages in length. Include at least two sources of research and follow APA guidelines for in text citations and citing references.

Note:

It is based on the Control and Pareto process improvement tools according to the DAMAIC.

These two processes above are the ones I used in week 5. I have attached the grading rubric. Hope this helps. Please let me know it you need anything else.

Answer preview
Improvement of the process requires systematic evaluation and removal of defects that slow the performance of the projects. Through most of the process control activities are handled at the primary level, and the sigma process handles only less than 10% its significance cannot be underrated. DMAIC focus on determination, measurement, analysis, improvement and the control of the current and the future performance resulting from the improvement (Antony et al., 2012)…
(750 words)
Scroll to Top