FACILITY LAYOUT

FACILITY LAYOUT

Case Study

Read the Chapter 9 Case Study “Facility Layout at Wheeled Coach Ambulance” (p. 404) and watch the video, then write a summary of at least 300 words using the accompanying discussion questions to guide your essay written in APA style, with a reference page and a cover page. APA requires double space. Your essay will be checked for originality via SafeAssign. There is not a target for matching but your instructor will be assessing that you have used your own words with proper in-text citations and quotation marks for direct quotes.

Case Study

Hi! In order to gain access to the case study you must go to my Blackboard and go to the course MAN4504. From there go to the etext and the this will give you access to the book. If you have to watch a video the link should be available.

school site: https://palmbeachstate.blackboard.com/webapps/assi...

Case study
When president Bob Collins began his career at Wheeled coach, the worlds largest manufacturer of ambulances, there were only a handful of employees. Now the firs florida plant has a workforce of 350. The physical plant has also expanded, with offices, R & D, final assembly, and wiring, cabinetry, and upholstery work cells into a separate building, aluminum fabrication and body installation into another, inspection and shipping into a forth, and warehousing into yet another. Like many other growing companies, Wheeled coach was not able to design its facility from scratch. And although management realizes that material handling cost are a little higher than an ideal layout would provide, Collins is pleased with the way the facility has evolved and employees have adapted. The aluminum cutting work cell lies adjacent to body fabrication, which, in turn, is located next to the body installation work cell. And while the vehicle must be driven across a street tone building for painting and then to another for final assembly, at least the ambulance is on wheels. Collins is also satisfied with the flexibility shown in the design of the work cells. Cell construction is flexible and can accommodate changes in product mix and volume. In addition, work cells are typically small and movable, with many work benches and staging racks borne on wheels so that they can be easily rearranged and products transported to the assembly line. Assembly line balancing is one key problem facing wheeled coach and every other repetitive manufacturer. Produced on a schedule calling for four 10-hour work days per week, once an ambulance is on one of the six final assembly lines, it must move forward each day to the next workstation. Balancing just enough workers and tasks at each of the seven workstations. Balancing just enough workers and tasks at each of the seven workstations. Balancing just enough workers and tasks at each of the seven workstations is a never-ending challenge. Too many workers end up running into each other, too few can’t finish an ambulance in seven days. Constant shifting of design of design and mix and improved analysis has led to frequent changes.
Answer preview
With the fast rates of innovation going on globally as a result of technologic advancements, the health sector has been opened to countless opportunities to mechanize its operations and interactions between health care deliverers and patients. The abundance in computers has led to a drop in their cost which goes ahead to pave the way for the uptake of technology in the delivery of healthcare services. Initially, hospitals had central computers in their institutions due to the cost of having a mainframe back in the day. With this wave, there comes a need for hospitals to have a new facility layout. One of these changes involves the interactions between patients and doctors…
(350 words)
Scroll to Top